Draft Stop Floor Framing Detail
So basically all plumbing electrical and ductwork rough ins should be 100 percent complete.
Draft stop floor framing detail. Draft stop between floors. R302 12 1 materials draftstopping materials shall be not less than 1 2 inch 12 7 mm gypsum board 3 8 inch 9 5 mm wood structural panels or other approved materials adequately supported. The area was an hvac chase that runs from first floor deck to second floor joist. Wood construction data 1.
This is a draft stop required to divide the mid floor when open web trusses are used so no area is greater than 1000 square feet. Floor framing is constructed of truss type open web or perforated members. Insulation is not an issue. These passage ways are sometimes hard to see when the drywall is not yet installed.
Draft stopping shall divide the concealed space into approximately equal areas. Such methods use a 4 foot design module which governs a 16 inch spacing of joists. You will want to hold off on the draft stop activity until all drilling and cutting in the walls are complete. The first approach to achieving a strong durable struc ture involving economical use of materials is to follow a basic modular plan for layout and attachment of framing members.
Scraps of lumber plywood and gypsum board are commonly used as fireblocking and draftstopping and something as simple as strips of 1 2 inch thick drywall fastened to the side of floor framing members and tight to the top of the ceiling membrane will typically suffice. So today i had a super pull me into a conversation between the hvac sub and himself about a draft stop. Ive always been called on and been under the impression from reading the code book that all floor ceiling and attic penetrations have to be draft stopped. Draft stops shall be installed in floor ceiling assemblies of buildings or portions of buildings used for other than dwelling or hotel occupancies so that the area of the concealed space does not exceed 1 000 square feet 93 m and so that the horizontal dimension between stops does not exceed 60 feet 18 288 mm.
This will allow the draft stop company to seal up all holes and gaps created while running mechanicals through the walls. When framing soffits or columns that will have drywall installed on them or any other architectural feature like an arch it seems that fire blocking is necessary because there is almost always a cavity on the top side that goes up into the ceiling or floor above.