Do Engineered Hardwood Floors Need To Acclimate
Yes since engineered wood flooring is constructed from natural hardwood it requires acclimation.
Do engineered hardwood floors need to acclimate. 3 days of acclimation is recommended for engineered flooring. It is a fact that wood flooring will always perform best when the environment is controlled and remains within a relative humidity range of 30 50. You do not want the relative humidity in your house to go outside this range not only for the health of your flooring but for your own health. Inside the boxes make sure the room or level where the flooring will be laid is an enclosed space.
If you re not sure whether your hardwood flooring needs to go through the acclimation process contact superior hardwoods of montana our experienced. Site finished and engineered flooring requires more time to acclimate. Between 5 and 10 days ahead of time check to see if the temperature and humidity of the space is at normal living conditions. Engineered hardwood flooring general rule.
The planks can remain in the box with the ends cut open for the duration of the. Some floor installers would say that 2 3 days is enough for the wood floors to acclimate fully. With some products you may have problems engaging the tongue and groove if it is acclimated to a higher moisture content. Some engineered flooring manufacturers recommend acclimation while others do not.
However when a wood subfloor is used you must account for possible expansion and contraction of the subfloor. Engineered hardwood wood subfloor engineered hardwood is more dimensionally stable than solid so it doesn t usually need to be acclimated to the same extent as solid hardwood. Once you start the process of acclimation to your engineered hardwood flooring you need to know when it has acclimated and is ready for installation. How to acclimate hardwood flooring.
Contrary to belief it has less do with the amount of time you should let flooring sit to acclimate on the job site and more to do with monitoring the moisture content of various components. Engineered and solid factory finished flooring often doesn t require acclimation provided the environment is within what s considered average humidity and temperature levels. Of course there are situations where wood flooring will need to acclimate. Do you need to acclimate engineered wood flooring.
If you re finishing wood floors on site you ll need to plan more time for the flooring to acclimatize as much as 5 7 days. Wood floor acclimation with engineered flooring.